Skip to main content

ABETEC also active in Portugal

New distribution centre in Moita, Portugal

New distribution centre in Moita
Customer
Aldi Portugal Supermercados
Building place
Moita, Portugal
Type of building
Logistics, Industry, Nutrition, Offices
Sector
Private sector
Floor space of the building
57 000 m²
Project sheet
Aldi @ Moita
Aldi @ Moita
A new distribution centre for Aldi has been built in Moita, Portugal. The largest distribution centre in the country. It is a project where, as a multidisciplinary team, we once again gave our best, both in the complete design and in supervising the execution of the works.

The distribution centre is a 57,000 sq m building on a 147,779 sq m site. The ground floor contains dry storage, technical areas and no less than 14,600 m² of refrigeration (at 15°C, 2°C and -21°C).
The mezzanine in turn contains 2,300 m² of offices, 750 m² of social areas and 1,350 m² of storage space.
The roofs of the distribution centre are equipped with 1MW of solar panels.

The completion date was April 2022. The distribution centre will allow more than 100 ALDI shops in Portugal to be supplied faster and more efficiently.
The new distribution centre stemmed from the company's need to expand in Portugal, which aims to reach 200 shops by 2025, and will enable more efficient management of all logistics activities.

ABETEC will thus have a repeated presence in Portugal.